Inspection and installation of the valve

by:Edison      2020-09-05

there are a lot of people don't understand inspection and installation of valves, today, small make up thermostatic valve factory is a brief introduction for you.

the valve before installation check

1. Carefully check check valve whether conform to the requirements of the drawings and specifications.

2. Check whether the stem and disc opens flexible, presence of jam and askew phenomenon.

(3) check valve is damaged, the thread of the valve is correct and complete.

(4) check whether the combination of the seat and body, disc and seat, valve cover and valve body, valve stem and disc coupling.

(5) check valve packing, packing and fasteners ( Bolt) Whether is suitable for the working medium properties.

6 to old, or put on hold for a long time of pressure reducing valve should be disassembled, dust, sand and other debris should be cleaned with water.

7) to remove his block, check the sealing, the valve must be closed tightly.

the valve pressure test

low pressure, medium pressure and high pressure valves for strength test and leak test and alloy steel valves for spectral analysis of the shell should also be individually, review the material.

1。 Valve strength test

strength test of the valve is in the condition of open valve test, the appearance of the leak check valve. PN acuities were 32 mpa valve, the test pressure for the nominal pressure of 1. Five times, the test time is not less than 5 min, shell and packing gland without leakage for qualified.

2。 Valve leak test

in the valve fully closed condition test, check for leakage valve sealing surface, the test pressure, in addition to the butterfly valve, check valve, bottom valve, throttle valve, the general should be with the nominal pressure, when can determine the working pressure, also can use 1. 25 times working pressure test, qualified for valve sealing surface does not leak.

the valve installed the general provisions of

1. The valve installation position should not interfere with the equipment, pipeline and the operation of the body itself, disassembling and maintenance, at the same time take into account the assembly of the beautiful shape.

2。 Horizontal line on the valve, the valve stem up installation, installation or tilted a certain Angle, not the handwheel downward installation. Air pipe valves, valve stem and the handwheel can be installed horizontally, with vertical chain lower remote control valve opening and closing.

3。 Arrangement is symmetrical, tidy and beautiful; Riser valve, on the premise of technology allows, the valve handwheel to chest-high optimum operating, general with 1 off the ground. 0 - 1. It is advisable to 2 m, and the valve stem must be installed along the operator.

4。 Side by side on the vertical pipe valves, the centerline elevation, and the clear distance between the handwheel is not less than 100 mm; Side by side on the horizontal line of the valve should be staggered installation, to reduce the pipe spacing.

5。 In water pump, heat exchanger equipment installed on the heavier the valve, should set the valve support; In the operating frequently and installed in the operating side. 1 again. The valve of more than 8 m, should set a fixed platform.

6。 Arrow mark, arrow on valve body pointing in the direction to the flow of the medium. When installing the valve, make the medium flow arrow pointing in the direction and the pipe should be paid attention to the same.

7。 Installing a flanged valves, should guarantee the two flange end face parallel to each other and concentric, double gasket shall be used.

8。 Installing a threaded valve, to facilitate disassembly, a threaded valve should be with a live through. Articulated Settings should consider maintenance convenience, is usually a flow through valve before flowing through live through.

the valve installation note

1. The valve body material use cast iron production, brittle, it shall not be affected by heavy impact.

2。 When transporting valves, are not allowed to casually throwing; Lifting, lifting the valve, the rope should wear on the body, do not tied to the handwheel, the valve stem and flange bolt hole.

3。 Valves should be installed in the operating, maintenance, and repair the most convenient place, it is forbidden to buried in the ground. Directly buried and trench inside the valve in the pipeline, should establish inspection shaft chamber, so that the opening and closing of the valve and regulating.

4。 Should guarantee the thread intact, and in the thread on the upper bound hemp, lead or ptfe teflon tape, turnbuckle, need to use hex wrench stuck twist into the pipe end the body.

5。 Flange valve installation, pay attention to the screw down the connecting bolt along the diagonal direction, budge when the strength should be uniform, in order to prevent or cause deformation and damage of the valve body gasket wandering.

6。 The valve should be kept closed when installation. To close against the wall of the screw thread valve is installed, often need to be lifted disc and stem the handwheel, turn to twist. When disassembling twisting to the wheel to keep the valve open, and then to remove.


is emerging as one of the most popular motor operated valve, moving beyond its hvac expansion valve benefits, with conclusive scientific evidence suggesting the positive role play in ac compressor control valve.
Check out Edison HVAC Valves for optimal quality products, and get your home thermostat problem fixed. Send us an enquiry or make a call if you are interested.
A wholesaler should have many hvac expansion valve based products that could help you if you have a ac compressor control valve problem. It is better to treat the problem early rather than have to deal with it later. Zhuhai Edison Smart Home Co., Ltd. is your best choice.
It's not enough to have an idea as motorized valve in a gigantic market. The key to what gets concerned is how you connect this hungry market to the idea that satisfies it.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...
Thank you so much for your enquiry. We will get back to you ASAP